Aviation / Infrastructure
Miami Int'l Airport · Terminal K
Sealed an active terminal expansion overnight — while the airport never stopped moving.
164 LF of SwiftWall Pro across two floors, stacked to a free-standing 16 ft, installed in three overnight shifts under Brand Safway. Passengers never saw a closure.